In November 2014, SBB commissioned the ARGE Marti Eppenberg with the main lot of the Eppenberg tunnel.
The basis for success was laid with the construction of the efficient and powerful infrastructure of the installation locations in Wöschnau and Gretzenbach.
In addition to the mining tunnel work, the ARGE Marti Eppenberg employees have been working in the portal areas with extensive special civil engineering and concrete work for over 2.5 years.
Marti Technik supplied the conveyor belt systems, a mobile and modular gravel plant was supplied by Simatec.
Com : Edwin : Thank you Youtube for recommending me this video. Glad that I do understand German (not all of it btw). Very nice video. Great in detail. Love it! To bad there is no undertitle for the not German speaking viewers!