Construction modifications on the 6 km long railway line, finishing work, new signage and cleaning. Loading of asphalt, concrete. Cleaning old rails with forks and pliers. Pulling out old posts at level crossings.
Machine: Volvo EW160E with Steelwrist X20
0:00 Loading the excavator on the low loader
1:47 Loading the rails with forks
2:28 Concreting the posts
3:15 Loading asphalt and rubble
4:12 Loading iron into a container
5:07 Concreting
6:13 Loading gravel
7:00 Rescue of the sunken Manu
7:18 Tearing the posts with a grab
9:42 Grapple panel loading
11:11 Folding panels
17:06 Loading posts and iron into a container